SDX /REBAR
TOOLS

SDX Rebar Tools

High-rise Construction

Prepared coupler assembly and main-bar bending need different tools. Keep these tasks separate when selecting equipment for columns, shear walls and building capping.

Upper floors of a high-rise concrete frame with reinforcement cages projecting above the formwork

Representative scene · Upper floors and projecting reinforcement on a high-rise under construction, Montreal.

Photo credit & source

High-rise construction, Montreal 2017.jpg — MB-one. Original source. CC BY-SA 4.0.

Cropped, proportionally resized and converted to WebP. This image adaptation is shared under CC BY-SA 4.0. Representative environment; no SDX project participation or endorsement is implied.

Download this image

Connection and building-capping operations

Connect vertical reinforcement and bend main bars at capping.

HRB bending machines · Coupler wrenches

Discuss this Application

01

Coupler installation

Match the bar and coupler outside diameters before selecting a connection wrench.

02

Capping and main-bar work

Compare the six HRB ranges for the specified bending or straightening task.

03

Position and handling

Review bar orientation, surrounding reinforcement and available power at the work level.

Bending and straightening must follow the project-approved requirements. A listed diameter range is not permission to rebend structural reinforcement.

Models for these tasks

Compare the listed ranges with your workpiece and installation requirements.

Coupler Connection

Bending / Straightening

Related selection guide →