SDX /REBAR
TOOLS

SDX Rebar Tools

Infrastructure Construction

Infrastructure procurement often covers several crews and connection locations. Build the tool schedule by the operation and work area, rather than specifying one generic package for every site.

Reinforced concrete walls, formwork and access platforms at South River Pump Station

Representative scene · Structural reinforcement at South River Pump Station.

Photo credit & source

Rebar-SouthRiver.jpg — Argyriou at English Wikipedia. Original source. CC BY 2.5.

Proportionally resized and converted to WebP. Representative environment; no SDX project participation or endorsement is implied.

Download this image

A task-based equipment schedule

Select connection tools for different work fronts.

Electric rebar coupler wrenches

Discuss this Application

01

Group connection positions

Separate horizontal bars, column reinforcement and cage connections in the schedule.

02

Match the power arrangement

Compare battery / power-line operation with a corded configuration for each work front.

03

Refer to the task

Use the bridge, tunnel or cage brief for the relevant access and installation requirements.

Tool selection is specific to the workpiece and site. Industry categories do not establish approval for every infrastructure project.

Models for these tasks

Compare the listed ranges with your workpiece and installation requirements.

Coupler Connection

Related selection guide →