SDX /REBAR
TOOLS

SDX Rebar Tools

Tunnel Construction

Tunnel reinforcement work combines restricted access with site-specific equipment rules. Cold saws and connection wrenches address different tasks and must be checked against those rules.

Dense curved reinforcement in an Aktio–Preveza tunnel structural element

Representative scene · Reinforcement for an Aktio–Preveza tunnel structural element.

Photo credit & source

Reinforcement of structural elements in Aktio–Preveza Undersea Tunnel.jpg — Η. Gouvas ( Harrygouvas). Original source. CC BY-SA 3.0.

Cropped, proportionally resized and converted to WebP. This image adaptation is shared under CC BY-SA 3.0. Representative environment; no SDX project participation or endorsement is implied.

Download this image

Within the site-approved work process

Adjust bar lengths and connect prepared reinforcement.

Cold-cutting saws · Coupler wrench

Discuss this Application

01

Length adjustment

Compare the two cold-saw capacities and the blade arrangement for the intended material.

02

Prepared coupler work

Review the 400RLB bar and coupler ranges when battery or power-line operation is required.

03

Site acceptance

Confirm permitted equipment, power supply, access and environmental conditions with the site team.

No explosion-proof or universal underground approval is implied. Use only equipment permitted for the actual environment.

Models for these tasks

Compare the listed ranges with your workpiece and installation requirements.

Coupler Connection

Cutting

Related selection guide →